by Sander | Mar 29, 2021 | Projects
Datacenter DCC provides a periodic check of the ambient air at a data center in Rotterdam. The generated information is used by the client to check the climate control logging system for correct operation. A mild climate is important in data centers to ensure that the...
by Sander | Mar 29, 2021 | Projects
Triton Knoll OWF DCC BV has been involved in the Triton Knoll OWF project. This project is located approximately 32 kilometres of the coast of the town of Lincolnshire and has a potential capacity of 855 MW. The windpark will provide green electricity for 900.000...
by Sander | Mar 25, 2021 | Projects
Team Terminal DCC BV is proud to have been awarded the responsibility for the coating and maintenance strategy for the TEAM Terminal, a large storage facility for crude oil in the Rotterdam area. The total painted surface area involved is estimated to be 250.000 m2....
by Sander | Mar 25, 2021 | Projects
Hartel Tank Terminal (HES) DCC BV is involved in the with the coating works on the new HES Hartel Tank Terminal on the Hartelstrook in the port Rotterdam. On the site of the new terminal a total of 54 new storage tanks are being built with a combined capacity of 1,3...
by Sander | Mar 25, 2021 | Projects
Akito Noshiro DCC BV has been involved in various Offshore wind turbine projects such as the Akita Noshiro project. This project is located in the vicinity of the Akita and Noshiro ports in Japan. For European standards this is a relatively small windpark consisting...
by Sander | Feb 17, 2021 | Projects, Uncategorized
Dow Terneuzen DCC BV has been asked by DOW Terneuzen to perform a condition survey on a number of factories. This is performed using our extensive experience and expertise in performing surveys. The condition of the coating systems is defined using, among others, ISO...