Triton Knoll OWF

DCC BV has been involved in the Triton Knoll OWF project. This project is located approximately 32 kilometres of the coast of the town of Lincolnshire and has a potential capacity of 855 MW. The windpark will provide green electricity for 900.000 households.  The coating works are performed on so called Monopiles on the site of SIF at the Maasvlakte and is performed by Van Ginkel. The so called “transition pieces” are built and coated by Smulders in Hoboken Belgium. DCC BV was involved from the start in the preparation and the making of specifications and inspection plans and negotiations with the end client. During the execution of the work DCC BV has performed QC inspections.